This client's name has been kept confidential, as is the case with some of our projects under commercial agreement. The project and the figures presented here are real.
A logistics development consortium in Guarulhos needed to equip a new warehouse complex with complete underground electrical infrastructure — from design to delivery, in just over a year.
A brand-new logistics complex requiring full underground electrical infrastructure specification from the design phase onward — multiple diameters to serve different sections of the network, on a tight construction schedule.
Supply of the Techduto NBR 450N line in 5 different diameters (50mm to 160mm), specified according to the needs of each section of the electrical network — from the main duct to the secondary branches.

What the partnership delivered
- 63,000 meters of electrical duct supplied
- 5 diameters specified according to the needs of each section
- Logistics complex delivered on schedule
Products Used and Related

Corrugated HDPE Conduit NBR 15715 – Techduto
Flexible corrugated HDPE conduit compliant with NBR 15715, with a tensile strength of 750…
View product →
Wavin Bidim® Geotextile Fabric
100% polyester nonwoven geotextile mats with full traceability for filtration, separation, drainage, and soil…
View product →
Drainage Geocomposite PEAD 1L, 2L and 2L-F — Techduto
Drainage geocomposite with a three-dimensional core made of HDPE geogrid and nonwoven geotextile. Replaces…
View product →
Techduto BIO
Three models with calibrated density for each process: 150 A for MBBR and IFAS,…
View product →