Solar Plants
DC cable protection, platform drainage, and road base — the plant's buried infrastructure, from a single supplier

The Challenge
Photovoltaic parks require three critical underground infrastructures operating in parallel: mechanical protection of buried DC and MV cables, fast platform drainage and tracker foundation stabilization. When any one fails, operations stop — and every hour of downtime in a 100 MW solar farm costs between R$ 8,000 and R$ 15,000 in lost revenue.
Techduto has been supplying the complete HDPE infrastructure for the sector for over a decade, with technical participation in drafting ABNT NBR 15715 and involvement in more than 260 solar farms in Brazil.
Techduto Solutions for Solar Plants
Recommended lines, uses, and key features
| Product Line | Use in Solar Plants | Technical Advantage |
|---|---|---|
| Techduto DW (double wall) | Main trunk for DC and MV cables in buried trenches | Smooth interior → 30% faster cable laying; corrugated outer wall SN 8 |
| Techduto NBR (UV line) | Sections exposed to sun: tracker, string box, solar roof | Exclusive anti-UV additive; compliant with ABNT NBR 15715; 25+ years lifespan |
| Techduto NBR (AC line) | Sections near inverter, transformer, electrical room | Flame retardant additive (self-extinguishing); reduces installation thermal risk |
| Techdreno DW | Underground drainage for platforms, accesses, and channels | 30% higher flow rate than traditional corrugated; frees tables in hours after rain |
| Geotêxtil Bidim | Separation, filtration, and protection of tracker foundations | Distributes load and separates layers — proven 25+ years in BR projects |
| Techduto Tape | Sealing connections between conduits and accessories | Permanent adhesion — watertightness against water and insects |
Challenges & Solutions
How Techduto solves each challenge in Solar Plants
DC/MV cables vulnerable to impact
Techduto DW double-wall conduit absorbs excavation impacts, root pressure and backfill loads, protecting solar cables for the entire project lifetime.
Flooded platforms halt trackers
Techdreno DW removes soil water from the table in hours, preventing tracker bogging, foundation erosion and generation loss.
UV exposure on aerial sections
Techduto NBR UV-additive line maintains mechanical integrity even on sun-exposed sections — string box, tracker, rooftop.
Invasive corrective maintenance
Smooth interior of Techduto DW allows cable replacement without digging a new trench — reduces maintenance time by up to 80%.
How We Apply
Techduto 3-step methodology
Engineering & Specification
Solar project analysis (power, table layout, tracker type, topography) defines cable cross-sections, trench depth, diameters and additive line (UV/AC) per section.
Logistics & Ready Stock
Production in SP, PE and MT with ready stock for delivery across Brazil. Rolls up to 300 m reduce field joints and speed installation.
Field Support
Techduto engineers accompany installation at large-scale solar farms: connection sealing with Techduto Tape, platform drainage with Techdreno DW and reinforcement with Bidim.
Where Techduto works on your solar plant
Click each point. See the real-world application of Techduto products in a large-scale photovoltaic plant.
















Pontos de aplicação
- Where the cable goes underground, it needs protection — Along the row itself, DC cabling typically runs clipped to the tracker structure, above ground. But at the drop points toward the string box and the collection run, it has to go underground — and cable buried directly in soil, unprotected, degrades from moisture and from the movement of O&M work itself. Techduto NBR protects the DC cabling in these buried stretches, from the string box to the collection run.
- Several DC circuits converge into reinforced ducting — DC circuits from several rows physically converge in the same trench on the way to the combiner box — each in its own conduit, never sharing a duct (NBR 5410 prohibits mixing DC and AC/MV circuits in the same conduit). Techduto DW (double wall) delivers the mechanical strength this higher-density conduit run demands.
- Crossing the access road without compromising the cable — Every machine and truck pass over the trench is a crushing risk for the cable buried below. Techduto DW in its reinforced class (750N) withstands access road traffic without compromising electrical protection.
- In clay soil or a high water table, water won’t drain on its own — Across most of the plant, stormwater management is surface-level only — grading and vegetative cover are enough. But in localized stretches of clay soil or high water table, standing water under the trackers hinders O&M access and accelerates corrosion. In those specific spots, Techdreno DW drains the platform and carries the water out of the generation area.
- The access road needs a structured base too — Internal O&M roads take repeated heavy traffic — without layer separation, the aggregate mixes into the subgrade and the road settles over time. Bidim geotextile separates the crushed-stone layer from the native soil, reduces the amount of aggregate needed during construction, and keeps the road stable through years of operation.
- A joint without proper sealing is an open door for moisture — Watertightness at the joint between conduit segments comes from the coupling sleeve with sealing ring (O-ring) — the correct mechanical jointing method for the Techduto NBR line. At critical points, DutoSeal Tape reinforces the external protection against moisture and abrasion.
- A bifacial row yields more with the right ground beneath it — A bifacial panel generates power from both sides — but only if the ground beneath it helps. A reflective fabric between rows raises the ground albedo, boosting panel output, while also controlling erosion and vegetation in the same space where Techduto products already protect cables and drain the platform. Our consultants guide the specification together with the conduit and drainage system.
FAQ
Common questions about Solar Plants
Why Techduto and not a reseller: since 1986, when it built Brazil's first corrugating machine by hand, Techduto has designed and manufactured its own line of corrugated pipes — it doesn't resell, it produces. Today, with factories in São José dos Campos (SP), Recife (PE) and Primavera do Leste (MT), the engineering behind Techdreno and Drainage Geocomposite is entirely its own. See our full history →