When one of the country's largest solar plants needed ducts, the answer was 1.7 million meters delivered at the pace of the project.
Urgent delivery of a massive volume of ducts for the new solar plant, with extreme logistical and production complexity — requiring coordination across multiple manufacturing units.
We mobilized factories in the Northeast and Southeast and integrated engineering, production and logistics to meet the project's accelerated schedule.

O que a parceria entregou
- +1.7 million meters of duct supplied
- +150 shipments at near-daily frequency
- Technical approval of all products
- Ongoing partnership with the largest photovoltaic installer in the country
Produtos Utilizados e Correlatos


TechBIO
Three models with calibrated density for each process: 150 A for MBBR and IFAS,…
View product →

DutoSeal Tape — High-Performance Tape
High-performance PVC adhesive tape for sealing and reinforcing connections in drainage systems. Provides excellent…
View product →

Techduto DW
Double-wall HDPE conduit for telecommunications, fiber optics, and electrical networks. Smooth interior for friction-free…
View product →

HDPE Corrugated Pipe — Techduto NBR
Flexible corrugated HDPE conduit compliant with NBR 15715, with a tensile strength of 750…
View product →


